• Project ObjectivesEnhance double deck transport capability across UK distribution network
  • Project OverviewDouble deck lifts installed at DC’s and RSU’s throughout UK
  • Project DesignSites surveys for each install – with Autoturn® software
  • Project Design20-tonne and 6.5-tonne double deck lifts – in self-contained loadhouse pods
  • Project DesignAll equipment surface-mounted, pre-built, pre-tested
  • Project DesignBespoke warehouse extensions – to enable access at space restricted sites
  • Project FulfilmentEach loadhouse installed & commissioned in up to 2 days
Banner Slider by WOWSlider.com v4.4

[ Back to Case Studies ]